Project-News

First ignition: Max Bögl's Kombi Power System is making progress

20.06.2013

First ignition: Max Bögl's Kombi Power System is making progress

The pot contains wood chips, which are heated to produce pyrolysis gas. This pyrolysis gas is burned absolutely cleanly. The energy generated during combustion is used to drive the turbine. Thanks to this process, the Kombi Power systems from Gammel Engineering are leaders in terms of emission values:

  • Fine dust for biomass < 5 mg / nm³ (permissible 20 or 50 mg/nm³)
  • Clean exhaust gas → no filter ash → no disposal costs
  • Complete burnout without residual coal and completely CO-free
  • Find out more about the Kombi Power System

    Gallery

    More News

    Energythinking

    More consulting expertise for our customers: New BAFA qualification in the team

    Read more
    15.01.2026
    Gammel-Inside

    Result of our Christmas fundraising campaign

    Read more
    13.01.2026
    Project-News

    Project news: iKWK Neu-Ulm & Senden

    Read more
    07.01.2026
    Experience and innovation
    in every project. *
    Contact
    Gammel Engineering GmbH
    An den Sandwellen 114
    93326 Abensberg
    Office Cham
    Gewerbepark Chammünster Nord 3
    93413 Cham

    Careers at Gammel Engineering